References:
[1] V. Deshpande, N. Patil, V. Baviskar, J. Gandhi, Plant layout optimization using CRAFT and ALDEP methodology, Product. J. Natl. Product. Council 57 (1) (2016) 32–42. ISSN: 0032-9924.
[2] J. Li, X. Tan, J. Li, Research on dynamic facility layout problem of manufacturing unit considering human factors, Math. Probl. Eng. 2018 (2018), 6040561, 13 pages, doi.org/10.1155/2018/6040561
[3] Fantoni, G., Al-Zubaidi, S.Q., Coli, E. and Mazzei, D. (2020), "Automating the process of method-time-measurement", International Journal of Productivity and Performance Management, Vol. ahead-of-print No. ahead-of-print. https://doi.org/10.1108/IJPPM-08-2019-0404
[4] Salam Qaddoori Dawood Al-Zubaidi, Gualtiero Fantoni, Franco Failli, Analysis of Drivers for Solving Facility Layout Problems: A Literature Review, Journal of Industrial Information Integration, March 2021 100187, https://doi.org/10.1016/j.jii.2020.100187.
[5] J. Balakrishnan, C. Cheng Dynamic layout algorithms: a state-of- the-art survey Int. J. Manag. Sci., 26 (4) (1998), pp. 507-521
[6] N. Hasan, F. Sepideh, M. Seyyed, G. Taghi, F. Mohammad Classification of facility layout problems: a review study Int. J. Adv. Manuf. Technol., 94 (2018), pp. 957-977, 10.1007/s00170-017-0895-8
[7] K. Mateusz, Chien-Ho Ko Facility layout design – review of current research directions Eng. Manag. Prod. Serv., 10 (3) (2018), pp. 70-79, 10.2478/emj-2018-0018.
[8] Patil N., Gandhi J. & Deshpande V. (2015). Techniques for solving facility layout problem: a survey AAICSET, 9, 352-360, ISBN: 9-780993-909238.
[9] McKendall, Alan R, Artak Hakobyan. (2010). Heuristics for the dynamic facility layout problem with unequal-area departments. European Journal of Operational Research 201(1) 171–182.
[10] Shahryar Rahnamayan, Hamid R. Tizhoosh, Magdy M.A. Salama, A novel population initialization method for accelerating evolutionary algorithms, Computers & Mathematics with Applications. Volume 53, Issue 10, May 2007, Pages 1605–1614
[11] A. Ebrahimi, R Kia, A. Komijan, Solving a mathematical model integrating unequal area facilities layout and part scheduling in a cellular manufacturing system by a genetic algorithm, SpringerPlus 4 (1) (2016) 1254, https://doi.org/10.1186/s40064-016-2773-5.
[12] Domingo, R., (2007) Materials flow improvement in a lean assembly line, Assembly Automation, Vol. 27, No. 2, pp.141–147, ISSN: 1741-0387
[13] A. Noor, K. Abu Bakar, S. Dahan, A. Adham, S. Sorooshian, Improvingproductivity by simulate facility layout: a case study in a car component manufacturer, Int. J. Ind. Manag. 2 (2016) 72–80, e-ISSN: 0127-564x.
[14] Cselényi, J.; Illés, B. Planning and Controlling of Material Flow Systems; textbook; Miskolci Egyetemi Kiadó: Miskolc, Hungary, 2006.
[15] R. Raminfar, N. Zulkifli, M. Vasili, T.S. Hong, An integrated model for production planning and cell formation in cellular manufacturing systems, J. Appl. Math. 2013 (2013), 487694 doi.org/10.1155/2013/487694.