Evaluation of the Performance of ACTIFLO® Clarifier in the Treatment of Mining Wastewaters: Case Study of Costerfield Mining Operations, Victoria, Australia
References:
[1] Seyed Mohsen Samaei, Shirley Gato-Trinidad, Ali Altaee, The application of pressure-driven ceramic membrane technology for the treatment of industrial wastewaters – A review, Separation and Purification Technology, Volume 200, 2018, Pages 198-220, ISSN 1383-5866.
[2] Recycled Water, Case Study: Bendigo Mining Water Treatment Plant,VIC(7ML/day), Access Date: (27/08/2018).
[3] Mak water, Case Studies, < https://www.makwater.com.au/case-studies/> Access Date: (27/08/2018).
[4] Citor Desalinators, Mine Site Archives, Access Date: (27/08/2018).
[5] Tara Tyrell, Queensland Mining &Energy Bulletin, Veolia to deliver Reverse Osmosis plant for Kirkland lake Gold in Victoria ,Australia, < https://www.qmeb.com.au/veolia-to-deliver-reverse-osmosis-plant-for-kirkland-lake-gold-in-victoria-australia/> Access Date: (27/08/2018).
[6] APT Aqua Pure Water Filters & Water Treatment Systems, Water Treatment Products-Mining Sites, Access Date: (27/08/2018).
[7] Water desalination +reuse , Veolia Water Tech to deliver RO reuse plant for gold mine, Access Date: (27/08/2018).
[8] B. Chakravorty, A. Layson, Ideal feed pretreatment for reverse osmosis by continuous microfiltration, Desalination, 110 (1997) 143-149.
[9] Veolia Water Solutions & Technologies, Operation and Maintenance Manual Mandalay WTP, in, 2014.
[10] Gregory Chris, Mandalay Resources-Costerfield, < https://www.mandalayresources.com/properties/costerfield/> Access Date: (27/08/2018).
[11] SRK Consulting (Australasia) Pty Ltd, Costerfiled Operation, Victoria, Australia NI 43-101 Technical Report, 2017.
[12] Environment Protection Authority Victoria- Australia, Mandalay Resources Costerfield Operations Pty Ltd License No:109992, 2014.
[13] S. Hajbabania, Mandalay Water Treatment Plant, Veolia Water Solutions & Technologies.
[14] Water Treatment Guide, RO membranes, < http://www.watertreatmentguide.com/membrane_condition.htm> Access Date: (27/08/2018).
[15] Environment Protection Authority Victoria- Australia, Mandalay Resources Costerfield Operations Pty Ltd Annual Performance Statement, Statement Period: 01 July 2016 to 30 June 2017.
[16] Kezia Kezia, Damien, Voysey, J. Dwyer, Veolia - Victorian Mine RO plant: Autopsy Report for RO Membranes, Wastewater Futures Pty Ltd, 2016.
[17] Veolia Water Technologies Clarification for Drinking Water Treatment: ACTIFLO®, Access date:(27/08/2018).
[18] Veolia Water Technologies, ACTIFLO® Process For Wet Weather and Wastewater Treatment, , Access date: (27/08/2018).
[19] ALS Environmental Certificate of Analysis, Environmental Division Melbourne 2015-2018.
[20] Environment Protection Authority Victoria- Australia, Mandalay Resources Costerfield Operations Pty Ltd Annual Performance Statement, Statement Period: 01 July 2015 to 30 June 2016.