Integrating Dependent Material Planning Cycle into Building Information Management: A Building Information Management-Based Material Management Automation Framework
References:
[1] "4D Simulation and Construction Planning | Autodesk University Workshop. (2017). Auworkshop.autodesk.com", http://auworkshop.autodesk.com/library/bim-curriculum-construction/4d-simulation-and-construction-planning, 2018. (Online). Available: http://auworkshop.autodesk.com/library/bim-curriculum-construction/4d-simulation-and-construction-planning. (Accessed: 21- Mar- 2017).
[2] Building Intuition, International Series in Operations Research & Management Science. 2008.
[3] H. Altay Guvenir and E. Erel, "Multicriteria inventory classification using a genetic algorithm", European Journal of Operational Research, vol. 105, no. 1, pp. 29-37, 1998.
[4] M. Schieg, "Risk management in construction project management, Journal of Business Economics and Management", pp. 7:2, 77-83, 2006.
[5] J. Miller, Implementing activity-based management in daily operations. New York: Wiley, 1996.
[6] Z. Ren, C. Anumba and J. Tah, "RFID-facilitated construction materials management (RFID-CMM) – A case study of water-supply project", Advanced Engineering Informatics, vol. 25, no. 2, pp. 198-207, 2011.
[7] N. Sanders, "Inventory Policy in a Fixed-Order Quantity System | Operations Management Defined | InformIT", Informit.com, 2018. (Online). Available: http://www.informit.com/articles/article.aspx?p=2167438&seqNum=8. (Accessed: 11- Feb- 2018).
[8] S. Shenoy, "Planning For Managing Risks On a Project -", Pmexamsmartnotes.com, 2018. (Online). Available: https://www.pmexamsmartnotes.com/plan-risk-management/. (Accessed: 11- Feb- 2018).
[9] P. Smith, "Project Cost Management with 5D BIM", Procedia - Social and Behavioral Sciences, vol. 226, pp. 193-200, 2016.
[10] "What Is A Fixed Order Point?: supplychain-mechanic.com", Supplychain-mechanic.com, 2018. (Online). Available: http://supplychain-mechanic.com/?p=116. (Accessed: 11- Feb- 2018).
[11] C. Tam and T. Tong, "GA-ANN model for optimizing the locations of tower crane and supply points for high-rise public housing construction", Construction Management and Economics, vol. 21, no. 3, pp. 257-266, 2003.
[12] The Public Risk Management Association, "A structured approach to Enterprise Risk Management (ERM) and the requirements of ISO 31000", AIRMIC, Alarm, IRM, 2010.
[13] Y. Wen, "Research on Cost Control of Construction Project Based on the Theory of Lean Construction and BIM: Case Study", The Open Construction and Building Technology Journal, vol. 8, no. 1, pp. 382-388, 2015.
[14] D. Young, C. Haas, P. Goodrum and C. Caldas, "Improving Construction Supply Network Visibility by Using Automated Materials Locating and Tracking Technology", Journal of Construction Engineering and Management, vol. 137, no. 11, pp. 976-984, 2011.
[15] Q. Yu, K. Li and H. Luo, "A BIM-based Dynamic Model for Site Material Supply", Procedia Engineering, vol. 164, pp. 526-533, 2016.
[16] G. Onwubolu and B. Dube, "Implementing an improved inventory control system in a small company: a case study", Production Planning & Control, vol. 17, no. 1, pp. 67-76, 2006.
[17] H. Said and K. El-Rayes, "Automated multi-objective construction logistics optimization system", Automation in Construction, vol. 43, pp. 110-122, 2014.
[18] A. Schlueter and F. Thesseling, "Building information model based energy/exergy performance assessment in early design stages", Automation in Construction, vol. 18, no. 2, pp. 153-163, 2009.
[19] WRAP, "Material Logistics Plan Good Practice Guidance", 2007.
[20] V. Methanivesana, "Improving Construction Logistics A case study of Residential Building Project", Stockholm, 2012.
[21] P. Saukkoriipi, "Waste in construction projects call for a new approach", 2007.
[22] S. Chenthoorun and M. Gnanasigamani, "A Study of Analysis And Performance Measurement Of Construction Logistics", International Journal of Science and Engineering Research (IJ0SER), 2017.
[23] D. Ristić, "A Tool For Risk Assessment", safety Engineering, 2018.
[24] N. Kasim, S. Liwan, R. Shamsuddin, R. Zainal and N. Kamaruddin, "Improving On-Site Materials Tracking for Inventory Management In Construction Projects", International Conference of Technology Management, Business and Entrepreneurship, 2012.
[25] J. Ali, R. Khan, N. Ahmad and I. Masqood, "Random Forests and Decision Trees", IJCSI International Journal of Computer Science Issues, 2012.