Procedure Model for Data-Driven Decision Support Regarding the Integration of Renewable Energies into Industrial Energy Management
References:
[1] Bundesministerium für Wirtschaft und Energie (BMWi), „Energie der Zukunft – Vierter Monitoring-Bericht zur Energiewende – Langfassung“, online available at: https://www.bmwi.de/DE/Mediathek/publikationen,did=739122.html, 2015, p. 4 et seq.
[2] Acatech, Forschungsunion, “Umsetzungsempfehlungen für das Zukunftsprojekt Industrie 4.0”, online available at: https://www.bmbf.de/files/Umsetzungsempfehlungen_Industrie4_0.pdf, 2013, pp. 23-31.
[3] K. Bleicher, “Das Konzept Integriertes Management”, Frankfurt/Main, Campus Verlag Frankfurt/New York, 2004, pp. 80-84.
[4] Fadi Shrouf, Joaquin Ordieres-Meré, Alvaro García-Sánchez, Miguel Ortega-Mier, “Optimizing the production scheduling of a single machine to minimize total energy consumption costs”, in Journal of Cleaner Production 67, 2014, pp. 197-207.
[5] S. Bougain, D. Gerhard, C. Nigischer, S. Ugurlu, “Towards energy management in production planning software based on energy consumption as a planning resource”, in Procedia CIRP 26, 2015, pp. 139-144
[6] M. J. Schniederjans, D. Schniederjans, C. M. Starkey, „Business Analytics Principles, Concepts, and Applications: What, Why and How.”, Upper Saddle River, New Jersey, Pearson Education, 2014, pp. 96-99.
[7] N. Lin, „Applied Business Analytics: Integrating Business Process, Big Data, and Advanced Analytics”, Upper Saddle River, New Jersey, 2015, pp. XVI et seq.
[8] M. Graus “Integration einer Datenanalytik in Energieinformationssysteme produzierender Unternehmen”, in Smart Energy 2016, pp. 44-55.
[9] M. Roscher, M. Graus, “Energiewende in der Industrie”, in VDE Kongress 2016, Internet der Dinge, 07. -08.11.2016 in Mannheim, 2016.
[10] R. Agrawal, K. Lin, H. S. Sawhney, K. Shim, “Fast similarity Search in the Presence of Noise, Scaling, and Translation in Time-Series Databases”, in Proceedings of 21th International Conference on Very Large Data Bases. Zurich, 1995, pp. 490-500.
[11] N. Löhndorf, M. Riel, S. Minner, “Simulation Optimization for the Stochastic Economic Lot Scheduling Problem with Sequence-Dependent Setup Times”, in International Journal of Production Economics, Volume 157, 2014, pp. 170-176.