Resource Leveling Optimization in Construction Projects of High Voltage Substations Using Nature-Inspired Intelligent Evolutionary Algorithms
References:
[1] Easa Said M., “Resource Leveling in Construction by Optimization,” Journal of Construction Engineering and Management, vol. 115, no. 2, pp. 302–316, Jun. 1989.
[2] S.-S. Leu and T.-H. Hung, “An optimal construction resource leveling scheduling simulation model,” Can. J. Civ. Eng., vol. 29, no. 2, pp. 267–275, Apr. 2002.
[3] D. Pythaloka, A. T. Wibowo, and M. D. Sulistiyo, “Artificial fish swarm algorithm for job shop scheduling problem,” in 2015 3rd International Conference on Information and Communication Technology (ICoICT), 2015, pp. 437–443.
[4] S. Kaiafa and A. P. Chassiakos, “A Genetic Algorithm for Optimal Resource-driven Project Scheduling,” Procedia Engineering, vol. 123, pp. 260–267, Jan. 2015.
[5] Wenmin Han and Binbin Zhu, “Research on New Methods of Multi-project Based on Entropy and Particle Swarm Optimization for Resource Leveling Problem,” in 2017 2nd International Symposium on Advances in Electrical, Electronics and Computer Engineering (ISAEECE 2017), 2017.
[6] V. Benjaoran, W. Tabyang, and N. Sooksil, “Precedence relationship options for the resource levelling problem using a genetic algorithm,” Construction Management and Economics, vol. 33, no. 9, pp. 711–723, Sep. 2015.
[7] D. Prayogo and C. T. Kusuma, “Optimization of resource leveling problem under multiple objective criteria using a symbiotic organisms search,” Civil Engineering Dimension; Vol 21, No 1 (2019): MARCH 2019DO - 10.9744/ced.21.1.43-49, Mar. 2019.
[8] D. Prayogo, M.-Y. Cheng, F. T. Wong, D. Tjandra, and D.-H. Tran, “Optimization model for construction project resource leveling using a novel modified symbiotic organisms search,” Asian Journal of Civil Engineering, vol. 19, no. 5, pp. 625–638, Jul. 2018.
[9] D. F. Dunham, “Robustness of genetic algorithm solutions in resource leveling,” in 2015 Systems and Information Engineering Design Symposium, 2015, pp. 267–272.
[10] J. L. Ponz-Tienda, A. Salcedo-Bernal, E. Pellicer, and J. Benlloch-Marco, “Improved Adaptive Harmony Search algorithm for the Resource Leveling Problem with minimal lags,” Automation in Construction, vol. 77, pp. 82–92, May 2017.
[11] A. Gaitanidis, V. Vassiliadis, C. Kyriklidis, and G. Dounias, “Hybrid Evolutionary Algorithms in Resource Leveling Optimization: Application in a Large Real Construction Project of a 50000 DWT Ship,” in Proceedings of the 9th Hellenic Conference on Artificial Intelligence, New York, NY, USA, 2016, pp. 25:1–25:8.
[12] A. Tzanetos and G. Dounias, “Sonar inspired optimization (SIO) in engineering applications,” Evolving Systems, pp. 1–9, 2018.
[13] A. Tzanetos, C. Kyriklidis, A. Papamichail, A. Dimoulakis, and G. Dounias, “A Nature Inspired metaheuristic for Optimal Leveling of Resources in Project Management,” in Proceedings of the 10th Hellenic Conference on Artificial Intelligence, 2018, p. 17.
[14] C. Kyriklidis and G. Dounias, “Evolutionary computation for resource leveling optimization in project management,” Integrated Computer-Aided Engineering, vol. 23, no. 2, pp. 173–184, Jan. 2016.
[15] K. Neumann and J. Zimmermann, “Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints,” European Journal of Operational Research, vol. 127, no. 2, pp. 425–443, Dec. 2000.
[16] M. A. Younis and B. Saad, “Optimal resource leveling of multi-resource projects,” Computers & Industrial Engineering, vol. 31, no. 1, pp. 1–4, Oct. 1996.
[17] S.-S. Leu, C.-H. Yang, and J.-C. Huang, “Resource leveling in construction by genetic algorithm-based optimization and its decision support system application,” Automation in Construction, vol. 10, no. 1, pp. 27–41, Nov. 2000.
[18] A. Tzanetos and G. Dounias, “A New Metaheuristic Method for Optimization: Sonar Inspired Optimization,” in Engineering Applications of Neural Networks, 2017, pp. 417–428.
[19] S. Kirkpatrick, C. D. Gelatt, and M. P. Vecchi, “Optimization by Simulated Annealing,” Science, vol. 220, no. 4598, pp. 671–680, 1983.